Double- Headed Metrolink!  Contributor's Pick!       
This train was late 45min because 873 was having problems so they added the 2nd engine.
Date: 6/19/2008 Location: Fullerton, CA   Map Show Fullerton on a rail map Views: 635 Collection Of:   Shelley H.
Locomotives: SCAX 873(F59PH) SCAX 882(F59PHI)    Author:  Shelley H.
Double- Headed Metrolink!
Picture Categories: This picture is part of album:  Fullerton3 6/19/08
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1216188